Details: 1.dismantling and removing the existing damaged aluminium / wooden / steel doors, windows, ventilators of area less than 3m2 including main frame with shutters and ms hold fast if any embedded in the masonry/concrete by cutting the masonry/concrete wherever required without any damages to the structure, transporting and handing over the materials to the rsd and conveying & stacking the debris at ground level within a lead of 50m for disposal, all as directed at site of work including all labour, tools equipments, transport, fuel, etc., complete. 2.dismantling and removing the wooden/ aluminium partition/door without damaging the structures nearby, transporting carefully and handing over the same to the departmental stores / rsd conveying, stacking the debris if any with in a lead of 50 mts for disposal including cutting the brick work / concrete wherever required all as directed at site of work including all labour, tools, equipments, transport, fuel, etc., complete. 3.dismantling
Sector: Harbor