Details: clearing light jungle with uprooting, levelling the uprooted area clearing the retrived materials from the site, transporting the retrived materials and disposing the retrived materials. earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. refilling with excavated earth other than crushed stone sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification supplying and filling in foundation, base
Sector: Electronics