The Tamil Nadu Urban Habitat Development Board - Multilateral Development Bank (WB_ADB) has published a tender for "IRSHUPSP/MEL/08" on the 23 Jan 2026. This tender belongs to Affordable Housing Construction category. This tender is published in Chennai, Tamil Nadu location. The vendors interested in this tender and related Affordable Housing Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: low cost housing Tenders | residential building Tenders | all civil works Tenders
Related categories: Cooperative Construction Tenders | Hostel Construction Tenders | Dormitory Operation Tenders |
Around 19419 tenders were floated in Tamil Nadu in the past month with major spending on road relaying Tenders, school repairs Tenders, pipe laying Tenders
| Tender Title | IRSHUPSP/MEL/08 |
|---|---|
| Tender Description | earth work excavation for foundation by mechanical means for isolated & combined footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the engineer with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the engineer.- upto required footing depth. data worked out for 48 m3 per day/8 hrs. with intial lead of 10 m and intial lift of 2.40 m with intial lead of 10 m and additional lift of 2.40-3.40 m supplying and filling in foundation, basement, etc with quarry dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the engineer. refilling with excavated earth other th |
| Comments | earth work excavation for foundation by mechanical means for isolated & combined footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the engineer with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the engineer.- upto required footing depth. data worked out for 48 m3 per day/8 hrs. with intial lead of 10 m and intial lift of 2.40 m with intial lead of 10 m and additional lift of 2.40-3.40 m supplying and filling in foundation, basement, etc with quarry dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the engineer. refilling with excavated earth other th |
| Published Date | |
|---|---|
| Due Date | 19 Feb 2026 00:00:00 |
| Estimated Value | 0.0 |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |