Details: schedule a-additional dining area at the northern side of community hall-earthwork excavation in trenches for foundation in sand and other loose soils not exceeding 1.50m in width and including dressing of sides and ramming of bottom lift upto 1.50m including getting out of the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m and lift of 1.50m, cost including shuttering, strutting, bailing out seepage of water wherever necessary etc., complete complying with aiss and as directed by the departmental officers. providing and laying plain cement concrete 1:4:8 (one part of cement, 4 parts of m. sand (crushed stone sand) & 8 parts of 40 mm nominal size metal ) for foundation using 40 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., complete complying with aiss and as directed by the departmental officers. providing and laying reinforced cement concrete 1:1.5:3 (one part of cement, one and a half
Sector: Harbor