Details: clearing the light jungle on either side road as per standard specification as directed by the departmental officers and including all other incidental charges etc., complete. as per mort & h 111, 112, 201 picking the existing bt surface, leveling and sectioning in accordance with specifications and as directed by the engineer. as per mort & h 111, 112, 202, 303.4.3, 501 providing and laying, spreading and compacting graded stone aggregate wet mix macadam specification including pre-mixing the material with water at omc in base mix plant (pugmill) carriage of mixed material by tipper to site and laying in uniform layers in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per mort&h vth revision 111, 112, 406, 900 providing and laying of prime coat using emulsion bitumen (ss1 ) at the rate of 7kg/10 sqm. over the wmm surface preparatory to another bituminous construction over it as per mort&h vth revision 111, 112
Sector: Road development