Details: bill of quantities 1.handling, lifting and removing of armor stone of various sizes from alignment of the existing revetment structure at sea side to the elevation of (+) 3.10 meters or as directed by the nodal officer to suite the site condition and stacking the same within a lead of 1km and reinstatement of the damaged revetment to its original position after assessment and weighing including all labour, tools, tackles, cranes, plant, equipment, machinery, transport, fuel etc. complete.note:1.the precise profile will be determined upon the submission of preliminary revetment levels prior to the commencement of work.2.weighment of the stone should be done before placing in revetment. 2.dismantling the existing plain cement concrete in the damaged portion of mass capping and wherever required as existing at site of work to the required size ,shape and level all as per relevant specification and directed at site of work including deposit the debris within a lead of 50m including all la
Sector: Harbor