Details: earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders ss.20b and sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 supply and delivery of pvc &gi specials ncluding cost for materials and all labour charges for completed hdpe pipe pn 12.50 90mm 90mm hdpe pipe 90 degree bend 90mm hdpe pipe equal tee conveyance of pipe line including all cost and conveyance all cost etc hdpe pipe pn 12.50 90mm refilling the excavated earth including all cost and conveyance charges etc hdpe pipe pn 12.50 90mm jointing hdpe pipes and specials by buttfusion welding / electro fusion welding jointsusing fusion equipment as per iso 21307
Sector: RDPR