Details: earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per ss 20b cement concrete 1:4:8 mix using 40mm iss metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 . supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement including conveyance of all materials to site and proper centering etc complete. cement concrete 1:3:6 mix using 20mm iss metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 . construction of granular sub base by providing well graded material (25 mm to 4.75 mm irc hbg metal @ 65 %,4.75 to 2.36mm irc hbg metal @20%&2.36 mm below irc hbg metal @15%)& (the material passing 425 m
Sector: RDPR