Details: earth work excavation and depositing on the bank with initial lead and lift of 10 metres and initial lift of 2 metres in hard stiff stiff clay stiff block cotton hard red earth murram, gravel stoney earth and earth mixed with small size boulders and hard gravelly soils (ss 20 b) etc., complete as per standard specification - 1m3 for drainage plain cement concrete using 1:4:8 mix ( one cement , four sand and eight aggregates) using 40 mm iss hbg metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. tndss no: 28 v, vi (s2) v,vi (s5a) vii supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as rcc slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with ms angles of size 25mm x 25mm
Sector: RDPR