Details: earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per ss 20b supply and filling in foundation and basement with river sand in layers of not more thean 15cm thick well rammed watered and compacted including & conveyance and all labour charges etc., complete. cement concrete 1:4:8 mix using 40mm iss metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete. random rubble masonry in cement mortar 1 : 5 for foundation and basement including necessary provision for bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. filling in basement with excavated earth in layers of not more than 15cm. thick well rammed, watered and consolidated complying with standard specifications etc., comple
Sector: RDPR