Details: dismantling and removal of reinforcement cement concrete (rcc) including stacking of serviceable materials and disposal of unserviceable materials with in a lead of 100m including all labour, tools, equipments, transport, fuel, etc., complete complying with aiss and as directed by the departmental officers. dismantling and removal of brick masonry work (bw) in cement mortar above g.l. upto floor two level including stacking of serviceable materials and disposal of unserviceable materials within a lead of 100 m including all labour, tools, equipments, transport, fuel, etc., complete complying with aiss and as directed by the departmental officers. earthwork in bulk excavation in dense (or) hard soil (exceeding 30cm in depth, 1.5m in width as well as 10 sqm. on plan) including disposal of excavated soil lead upto 50m, disposed soil to be levelled and neatly dressed etc., complete complying with aiss and as directed by the departmental officers. filling basement with available excavated e
Sector: Harbor