Details: providing paver block earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per ss 20b cement concrete 1:4:8 mix using 40mm iss metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 . supply and errecting centring including all cost and conveyence and all labour charges for sides.etc complete cement concrete 1:3:6 mix using 20mm hbg metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. construction of granular sub base by providing well graded material (25 mm to 4.75 mm irc hbg metal @ 65 %,4.75 to 2.36mm irc hbg metal @20%&2.36 mm below irc hbg metal @15%)& (the material passing 425 microns sieve shall hav
Sector: RDPR