Description: S R to G No 1 to 3 such as flooring replacement of roof sheet plastering painting of walls iron and wood painting repairs to rolling shutters loading platform repairs to road and weighbridge room reconstruction of C Wall at Pollachi Warehouse Name of Work Special Repairs to Godown No 1 to 3 such as flooring replacement of roofing sheet plastering painting of walls iron painting wood painting repairs to rolling shutters loading platform repairs to road and weighbridge room reconstruction of compound wall etc at Pollachi Warehouse
Details: Dismantling clearing away and carefully stacking the materials useful for reuse of any thickness, stacking the debris away from the site in the low lying areas inside the campus) Dismantling RCC Dismantling PCC AC roof sheet without timbers Brick/Stone masonry in Cement mortar walls Supplying and filling foundation and basement with filling M.sand in layers of not more than 15cm thick well ramed consolidated etc., complete complying with standard specification. Chipping the concrete and Roughening the surface etc., complete complying with standard specification and as directed by the departmental officers. Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification Plain Cement Concrete 1:2:4 (1 cement, two M.San
Sector: Logistics and warehouses