Details: earth work in excavation by manual means over areas (exceeding 130cm in width as well as10 sqm on plan) including disposal of excavated earth lead upto 50mtrs and lift upto 1.5mtr. (all kinds of soil @70%) earth work in excavation by manual means over areas (exceeding 130cm in width as well as10 sqm on plan) including disposal of excavated earth lead upto 50mtrs and lift upto 1.5mtr. (soft rock @20%) earth work in excavation by manual means over areas (exceeding 130cm in width as well as10 sqm on plan) including disposal of excavated earth lead upto 50mtrs and lift upto 1.5mtr. (hard rock @10% b.p) earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:all kinds of soil ,50 me
Sector: Forest and Environment