The PWD Ladakh has published a tender for "Land development at PHQ Campus Agling Phase - I" on the 13 Sep 2025. This tender belongs to Land Levelling category. This tender is published in Leh, Ladakh location. The vendors interested in this tender and related Land Levelling tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: land preparation services Tenders | all civil works Tenders | all earthwork Tenders
Related categories: Land reclamation service Tenders | Rock removal service Tenders | Earthmoving service Tenders |
Ladakh has published 74 tenders in Land Levelling in the last financial year.
Out of these, 3 were published last month.
Tender Title | Land development at PHQ Campus Agling Phase - I |
---|---|
Tender Description | earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres. a) all kinds of soil. b) ordinary rock dry stone pitching (any thickness) excluding cost of stones. on horizontal providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:3:6 (1 cement : 3 manufactured sand derived from recycled concrete aggregate (rca) : 6 graded stone aggregate 40 mm nominal size recycled aggregate (ra)) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:4:8 (1 cemen |
Comments | earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres. a) all kinds of soil. b) ordinary rock dry stone pitching (any thickness) excluding cost of stones. on horizontal providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:3:6 (1 cement : 3 manufactured sand derived from recycled concrete aggregate (rca) : 6 graded stone aggregate 40 mm nominal size recycled aggregate (ra)) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:4:8 (1 cemen |
Published Date | |
---|---|
Due Date | 01 Oct 2025 00:00:00 |
Estimated Value | 3.2 Crore |
---|---|
EMD | 0 INR |
Processing Fee | 0 INR |