The PWD Ladakh has published a tender for "Laying and fitting of pipe line of left out inhabitants under Up-gradation/ retrofitting of Water Supply Scheme Trespone (under JJM)." on the 09 Sep 2025. This tender belongs to Pipe Laying category. This tender is published in Kargil, Ladakh location. The vendors interested in this tender and related Pipe Laying tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: pipe laying Tenders | water pipe laying Tenders | pipe laying services Tenders
Related categories: Airport Runway Tenders | Airport Runway Repair Tenders | Road Paving Tenders |
Ladakh has published 234 tenders in Pipe Laying in the last financial year.
Out of these, 7 were published last month.
Tender Title | Laying and fitting of pipe line of left out inhabitants under Up-gradation/ retrofitting of Water Supply Scheme Trespone (under JJM). |
---|---|
Tender Description | earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundation ,drains, pipes ,cables etc.(not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in: all kind of soil 60% ordanary rock 25% hard rock (by cheseling) 15% laying and fitting of pipes complete excluding cost of pipes and required fittings as per the direciton of site engineer incharge including all carriage complete. hdpe pipe 25mm dia hdpe pipe 20mm dia hdpe pipe 75mm dia filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. layers not exceeding 20cm in depth, consolidation each deposited layer by ramming and watering lead up to 50mtr and left up to 1.5m. |
Comments | earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundation ,drains, pipes ,cables etc.(not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in: all kind of soil 60% ordanary rock 25% hard rock (by cheseling) 15% laying and fitting of pipes complete excluding cost of pipes and required fittings as per the direciton of site engineer incharge including all carriage complete. hdpe pipe 25mm dia hdpe pipe 20mm dia hdpe pipe 75mm dia filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. layers not exceeding 20cm in depth, consolidation each deposited layer by ramming and watering lead up to 50mtr and left up to 1.5m. |
Published Date | |
---|---|
Due Date | 13 Sep 2025 00:00:00 |
Estimated Value | 8.18 Lakh |
---|---|
EMD | 0 INR |
Processing Fee | 0 INR |