Description: Outdoor Destination Signage Home Stays At Craft Village Name of Work Outdoor destination signage homestays under likir craft village Adv cost 5 66 lacs Scheme SDP Block Nimoo
Details: Earth work in excavation by manual means (Hydraulic excavator) in foundation trenches or drains (notexceeding1.5m in width or10sqm on plan), including dressing of sides and ramming of bottoms, lift upto1.5m, including disposal of excavated earth upto 1 metre from cutting edge disposed earth is to be levelled and neatly dressed in: All kinds of soil: Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) Stone tile work for wall lining upto 10 m height with special adhesive over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand), including pointing in white cement with an admixture of pigment to match the stone shade.Granite stone of any colour and shade Steel work in built up tubular (round, squareor rectangularhollow
Sector: RDPR