Details: earth work in excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-incharge. all kinds of soil proividing and laying dry stone solling in horizontal layer including cost of stone complete job. providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- all work upto plinth level. 1:3:6 (1 cement : 3 coarse sand (zone-iii) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) centring and shuttermg including strutting, propping etc. and removal of form for· foundations, footings, bases of columns, etc. for mass concrete random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth l
Sector: RDPR