Details: earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc. not exceeding 1.5m in width and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, incl. dressing of sides and ramming of bottoms lift upto 1.5m, incl. getting out excavated earth and disposal of surplus excavated earth as directed, within lead of 50mtrs. all kinds of soil ordinary rock hard rock providing, laying and fitting of hdpe pipe conforming to is 4984 :1995 with latest amendements and conveying to work site incl. loading and unloading at both destinations and rolling, lowering into the trenches, laying true to line and jointing of pipes and specials by electrofusion welding as per standard procedure and guidlines, incl. encasing the pipe around to a depth not less than 15 cms with soft earth or selected earth available from the excavation etc, complete giving hydraulic test as per relevant isi with all leads and lifts incl. testing commissioning the rate is exc