Details: laying and jointing pvc pipe. heading excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres. earth work in excavation by mechanical means (hydraulic excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil. providing and laying hand packed stone soling in building works with clean hard selected stone all complete. (manual means). p/l in position cement concrete of 1:2:4(1 cement,2 coarse sand,4 graded stone aggregate of 20mm and down size) i/c compacting curing etc all complete. providing and laying damp proof coarse 40 mm thick with cement concrete 1:2:4 ( 1 cement, 2 clean coarse sand, 4 graded stone aggregate 12.5 mm
Sector: Buildings