Details: excavation work by mechanical means (hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :1:4:8 (1 cement : 4 coarse sand (zone-iii) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 in foundation and plinth in cement mortar 1:6 (1 cement : 6 coarse sand) filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead u
Sector: Police and Internal Security