Description: Construction of 50 Nos of Ferro Cement Rainwater Harvesting Structure 1 5 x 1 5 m x 1 5 m at Minicoy under subsidy scheme Re Tender IV Name of Work Construction of 50 Nos of Ferro Cement Rainwater Harvesting Structure 1 5m x1 5m x1 5 m at Minicoy under Subsidy Scheme Re Tender
Details: Surface dressing of the ground including removing vegitation and in equalities not exceeding 15cm deep and disposal of rubbish lead up to 50 metres and lift up to 1.5 metres Earth work excavation (by manual means) in foundation trenches or drains (not exceeding 1.5m in width or 10 sq.m on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. Providing and laying cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) excluding the cost of centring and shuttering and reinforcement for foundation and plinth Cold twisted steel reinforcement for R.C.C work including bending, binding and placing in position, etc. - complete. 6mm thick cement plaster in CM 1:3 (1 cement : 3 fine sand) 12 mm cement plaster finished with a floating coat of neat cement of mix : 1:3 (1 cement: 3 fine sand) Applying one coat of water thin
Sector: District Administration