Details: providing new service connections (over head line): fixing suitable cutout fuse, fixing energy meter, providing service line, providing line connections, etc. over head service lines should be clipped to the stay wire using proper cable tie. service wire with stay wire tied at proper height and tight. (the distance between post and consumer meter point is up to 30 mtrs length/ above 30 mtrs length). single phase connection (up to 30 mtrs distance) three phase connection (up to 30 mtrs distance) single phase connection (above 30 mtrs distance) three phase connection (above 30 mtrs distance) providing new service connections (ug cables): fixing and clipping the ug cable to the wall with proper cable clip, fixing suitable cutout fuse, fixing energy meter, providing line connections, etc (excluding cable laying works) single phase connection three phase connection ug cable joining ht, 11 kv lines: cutting cables, removing insulations, semi conductors, cable joining with suitable joint
Sector: District Administration