Details: demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete cement concrete work 1:2:4 (1.cement:2.river sand:4.granite chips 20mm) laid to requered slop and camfer including consolidating, finishing, tamping, centering and shuttering etc. complete in embarkment, roads, taxi tracks, pavement and like. earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in- charge. providing and laying in position cement concrete of specified grade excluding the cost of centering
Sector: District Administration