Details: excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff pto 50 meter lead.(a) loose or soft soil excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 meter lead.(a) loose or soft soil filling available excavated earth (excluding rock) in trenches. plinth, sides of foundations etc. in layers not exceeding 20 cm. in depth consolidating each disposited layer by ramming and watering. providing material and labour for filling in plinth with unscreen gravel under floors including watering, ramming consolidating and dressing etc. complete. providing material and labour for filling in foundation and plinth with rubble under floors including filling gravel in gaps and consolidating deposited layers by ramming water etc. complete. providing and laying cem
Sector: Urban Authority