Details: excavation for foundation up to 1.50 mt. depth including sorting out and stacking of use ful materials and disposing off the excavated stuff up to 50 meter lead (a) loose or soft soil. excavation for foundation up to 1.50 mt. to 3.00 mt. depth including sorting out and stacking of use ful materials and disposing off the excavated stuff up to 50 meter lead (a) loose or soft soil. filling available excavated earth (excluding rock) in tranches plinth, sides of foundation. etc. in layers not exceeding 20 cm in depth. consolidating each deposited layer by ramming and watering. providing material and labour for filling in foundation and plinth with gravel including consolidating deposited layers by ramming watering etc.complete filling in foundation and plinth with brick bats chhara in layers of 20cm. thickness including watering, remming and consolidating etc. complete. providing and laying cement concrete 1:2:4 (1- cement : 3- coarse sand : 6- graded stone aggregates 20 mm nominal size)
Sector: Urban Authority