Details: rrm wall excavation for structures (earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)i) ordinary soil manual means pcc 1:3:6 in foundation (plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications. random rubble masonry back filling behind abutment, wing wall and return wall complete as per drawing and technical specification. granular material plastering with cement mortar (1:3 ) on brick work in sub-structure as per technical specifications providing weep holes in brick masonry/plain/reinforced concrete abutmen
Sector: Buildings