Details: side development / earthfilling back filling behind abutment, wing wall and return wall complete as per drawing and technical specification.granular material clearing and grubbing road land . (clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)- in area of thorny jungle rcc retaining wall earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more tha providing and laying in foundations and plinth cement concrete 1:5:10 ( 1 cement : 5 coarse sand : 10 graded stone aggre
Sector: Buildings