Description: C o SEs Office Building Cum Residential Buildings for Newly Shifted Subansiri Basin to Ziro in Lower Subansiri District SH Site Development for SE Office Building T III and T V Qtrs Formation Cutting WBM and CC Pavement for Approach Road etc Name of Work C o SE s Office Building cum Residential Buildings for Newly Shifted Subansiri Basin to Ziro in Lower Subansiri District SH Site Development for SE Office Building T III T V Qtrs Formation Cutting WBM and CC Pavement for Approach Road C o Residential Type II T III T V Qtrs RRM Wall and Boundary Wall
Details: SH: Site Development for SE Office Building Excavation in Soil with Dozer with lead upto 100 metres (Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordancewith the requirements of lines, grades and cross sections.) SH: Site Development for T-III Qtrs. (One Block 2 Units) Excavation in Soil with Dozer with lead upto 100 metres (Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres
Sector: Generation