Description: C o Protection wall near SP and DC Banglow Dhobi Line at Kameng River Name of Work C o Protection wall near SP s DC s Banglow Dhobi Line at Kameng river
Details: SH: Retaining wall. Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) Ordinary soil (A). Manual Means (Depth upto 3 m) PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications. RCC M20(USING CONCRETE MIXTURE) a) Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications Centring and shuttering including strutting, propping etc
Sector: PWD