The HUD Arunachal Pradesh has published a tender for "Const. of 5 MT per day capacity Material Recovery Facility at Jairampur, Changlang District, AP." on the 03 Mar 2026. This tender belongs to Waste Disposal Plant category. The vendors interested in this tender and related Waste Disposal Plant tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related categories: FGD System Tenders | Chemical Plant Repair Tenders | Oil Refinery Construction Tenders |
HUD Arunachal Pradesh issued 30 tenders for Waste Disposal Plant last year
With, 0 floated just last month.
| Tender Title | Const. of 5 MT per day capacity Material Recovery Facility at Jairampur, Changlang District, AP. |
|---|---|
| Tender Description | sh:- formation cutting excavation in hill area in soil by mechanical means (excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) excavation in hilly area in ordinary rock by mechanical means not requiring blasting. (excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) (sh:- mrf building) earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming |
| Comments | sh:- formation cutting excavation in hill area in soil by mechanical means (excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) excavation in hilly area in ordinary rock by mechanical means not requiring blasting. (excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) (sh:- mrf building) earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming |
| Published Date | |
|---|---|
| Due Date | 10 Mar 2026 00:00:00 |
| Estimated Value | 0.0 |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |