The HUD Arunachal Pradesh has published a tender for "Design, Build and Commission of Faecal sludge-septage Treatment Plant, I and D structures and Soak Pits with 5 years of Operation and Maintenance in Hawai ULB of Arunachal Pradesh" on the 10 Nov 2025. This tender belongs to STP Plant Construction category. This tender is published in Papum Pare, Arunachal Pradesh location. The vendors interested in this tender and related STP Plant Construction tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: non residential buildings Tenders | all civil works Tenders | non residential buildings construction Tenders
Related categories: Chemical Plant Construction Tenders | FGD System Tenders | Chemical Plant Repair Tenders |
Around 422 tenders were floated in Arunachal Pradesh in the past month with major spending on vehicle spares Tenders, construction materials Tenders, inter segment purchase Tenders
| Tender Title | Design, Build and Commission of Faecal sludge-septage Treatment Plant, I and D structures and Soak Pits with 5 years of Operation and Maintenance in Hawai ULB of Arunachal Pradesh |
|---|---|
| Tender Description | construction of fstp with planted drying bed drying beds earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) lift upto 1.50m and stacking the excavated soil not more than 3m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required into plinth sides of foundation etc. consolidating each deposited layer by arming and watering of all surplus soil as directed within a lead of 50m in all types of soils earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) lift upto 1.50m and stacking the excavated soil not more than 3m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required into plinth sides of foundation etc. consolidating each |
| Comments | construction of fstp with planted drying bed drying beds earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) lift upto 1.50m and stacking the excavated soil not more than 3m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required into plinth sides of foundation etc. consolidating each deposited layer by arming and watering of all surplus soil as directed within a lead of 50m in all types of soils earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) lift upto 1.50m and stacking the excavated soil not more than 3m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required into plinth sides of foundation etc. consolidating each |
| Published Date | |
|---|---|
| Due Date | 17 Nov 2025 00:00:00 |
| Estimated Value | 0.0 |
|---|---|
| EMD | 0 INR |
| Processing Fee | 0 INR |