The HUD Arunachal Pradesh has published a tender for "Design, Build, Construct and Commission of Sewage Treatment Plant along with Co-treatment of Faecal sludge-septage with 5 years of Operation and Maintenance in Namsai ULB of Arunachal Pradesh" on the 19 Sep 2025. This tender belongs to Sweage Treatment Plant Consultancy category. This tender is published in Papum Pare, Arunachal Pradesh location. The vendors interested in this tender and related Sweage Treatment Plant Consultancy tenders can obtain further details by exploring Tendersniper web portal. Tendersniper sends regular tender alerts by email specifically addressing the user requirements (i.e., keywords, location and value range). Government business is a growing area of opportunity. The businesses are encouraged to actively monitor tender opportunities and participate in them to grow their business.
Related alert: wastewater treatment consultancy Tenders | water and wastewater treatment consultancy Tenders | effluent and sewage treatment consultancy Tenders
Related categories: Technical Drawing Tenders | AutoCAD Drawing Tenders | Architectural and PMC Tenders |
Tender Title | Design, Build, Construct and Commission of Sewage Treatment Plant along with Co-treatment of Faecal sludge-septage with 5 years of Operation and Maintenance in Namsai ULB of Arunachal Pradesh |
---|---|
Tender Description | construction of rcc elevated platform for screen channel and grit chamber earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) lift upto 1.50m and stacking the excavated soil not more than 3m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required into plinth sides of foundation etc. consolidating each deposited layer by arming and watering of all surplus soil as directed within a lead of 50m in all types of soils for footings earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) lift upto 1.50m and stacking the excavated soil not more than 3m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required into plinth sides of founda |
Comments | construction of rcc elevated platform for screen channel and grit chamber earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) lift upto 1.50m and stacking the excavated soil not more than 3m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required into plinth sides of foundation etc. consolidating each deposited layer by arming and watering of all surplus soil as directed within a lead of 50m in all types of soils for footings earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock) lift upto 1.50m and stacking the excavated soil not more than 3m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required into plinth sides of founda |
Published Date | |
---|---|
Due Date | 03 Oct 2025 00:00:00 |
Estimated Value | 0.0 |
---|---|
EMD | 0 INR |
Processing Fee | 0 INR |