Description: Construction of Approach Road to Kammuk Bridge point to connect new District HQ at Boleng Name of Work C o Approach Road to Kammuk Bridge point to connect new District HQ at Boleng
Details: SH: Formation Cutting Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) Excavation in Hilly Area in Ordinary Rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres. SH: RCC slab culvert 1.5 m span. Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)I Ordinary SoilA Manual Means(i) upto 3 m depth PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundati
Sector: PWD