Details: 1. (sh:- earth filling) embankment construction with material obtained from borrow pits (construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2) 2. ( sh: toe wall 1.20 mtr height) excavation for structures (earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material ordinary soil manual means upto 3 m depth pcc 1:3:6 in foundation (plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) stone masonry work in cement mortar 1:3 in foundation complete as drawing and technical specif
Sector: PWD