Details: sh-i-dismantling of flexible pavements -2.17km dismantling of flexible pavements (dismantling of flexible pavementsand disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) ii by mechanical means a bituminous course formation cutting (widening of road)-7.00 km excavation in soil with dozer with lead upto 100 metres excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. excavation in soil with dozer with lead upto 100 metres excavation for roadway in ordinary rock by deploying a dozer, 80 hp including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades
Sector: PWD