Details: library building earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock),liftupto1.50m and stacking the excavated soil not more than 3m clear from the edge of the excavation and returning the stacked soi lin15cm layers,when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete. filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: a) foundations and plinth reinforced concrete work in foundation
Sector: Education Misc