Details: ( sh: academic hostel block ) earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete. filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. a) foundations and plinth providing and laying cement concr
Sector: Education Misc