Details: demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per directionof engineer - in - charge.a) nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan), including dressing of sides and ramming ofbottoms, lift upto 1.5 m, including getting out the excavated soil anddisposal of surplus excavated soil as directed, within a lead of 50 m.a) all kinds of soil. centering and shuttering including strutting, propping etc. and removal of form fora)foundations, footings, bases of columns, etc. for massconcrete centering and shuttering including strutting, propping etc. and removal of form fora) walls (any thickness) including attached pilasters, butteresses,plinth and string courses etc. providing and laying in position cement concrete of specified gradeexcluding the co
Sector: Municipality