Description: Construction of RCC Drain FROM Timber Treatment Plant to Road side Drainage for a length of 65 Metres during 2024 25 Name of Work Construction of RCC Drain FROM Timber Treatment Plant to Road side Drainage for a length of 65 Metres during 2024 25
Details: Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand(zone-III) : 8 graded stone aggregate 40 mm nominal size). Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns. Reinforced cement concrete work in w
Sector: Forest and Environment