Details: earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m, disposed soil to be levelled and neatly dressed : all kind of soils: post holes, plinth wall, protection wall, pathway. excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level : 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). post holes, plinth wall, protecton wall , pathway, under floor 1:2:4 (1 cement : 2 coarse sand (zone-iii) : 4 graded stone aggregate 20 mm nominal size): protection wall, path way, steps centering and shuttering including
Sector: Forest and Environment