Details: 2.3 road gsr 2023 clearing and grubbing road land .(clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) (ii) by manual means a) in area of light jungle 4004 gsr bldg 2023 earthwork in surface excavation not exceeding 30 cm depth(but exceeding 1.5 m width as well as 10 sq.m on plan) including disposal of excavated earth beyond work site for all leads lift disposed earth to be leveled and neatly dressed in: b)hard soil 3.16 gsr road 2023 embankment construction with material obtained from borrow pits (constru
Sector: Buildings