Details: excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankement upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.as per morth specification 301. trenches supplying of laterite stone soling of size 150-200 mm size and murrum having p.i. value not more than 6 and laying including packing with smaller stones and consolidation with power road roller including spreading, watering and consolidation of binding material etc. (measurements shall be considered on finished item) . transportation
Sector: Forest and Environment