Details: for executing the works of desilting work of mapusa river from mapusa highway bridge at tar to downstream upto moira within an area of 5.0 kilometers in length, 15.0 metres wide and 2.0 metres depth from existing depth, including the disposal of the desilted materials / spoils at the designated disposal ground, strictly as per the provisions of the c. r. z. notification, 1991 or as directed by the captain of ports. this work needs to be commenced by december, 2023 and needs to be completed by march, 2023.
Sector: Harbor