Description: Construction of retaining wall for nallah along with road and PHE work at Poddocem Name of Work Construction of Retaining wall for Nallah at Podoccem along with Road PHE
Details: Clearing and Grubbing Road Land . (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and trees girth up to 300mm,removal of stumps of trees cut earlier and disposal of unserviceable material and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness) (ii) By manual means A) In area of light jungle Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in :b) All types of Ordinary rock including all types of laterite rock, blasting prohibited. Embankment Construction With Material Obtained From Borrow Pits ( Construction of embank
Sector: Buildings