Details: excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankement upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.as per morth specification 301 rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. centering & shuttering including strutting, propping & removal of forms for : foundations, footings, bases for columns providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost o
Sector: PWD