Details: providing and applying tack coat with bitumen grade of 80/100 or bitumen emulsion using pressure distributor on the prepared bituminous/granular surface cleaned with mechanical broom as per mort&h specifications clause 503.bitumen 80/100 @ 0.375 kg/sq.m providing and applying tack coat with bitumen grade of 80/100 or bitumen emulsion using pressure distributor on the prepared bituminous/granular surface cleaned with mechanical broom as per mort&h specifications clause 503.bitumen 80/100 @ 0.20 kg/sq.m providing and laying 50mm(consolidated thickness)full grout using granitic or basaltic stone of specified grading at 6.00 cu.m. per 100 sq.m. grouting with hot bitumen straight run bitumen(or with such bituminous material of grade and type as specified by the engineer-in-charge)at 5.0kg. per sq. m. binding with key aggregate of granitic or basaltic stone of specified grading at 1.5 cu.m. per 100 sq.m. including providing and laying seal coat sealing the voids in a bituminious
Sector: PWD