Details: dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 meters lead for thickness of tiles 10mm to 25mm. earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in : all kinds of soil rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: all works upto plinth level providing and laying factory made shot blasted cement concrete interlocking paver block of minimum m35/
Sector: Urban Authority