Details: cutting in earth work in all classification of soil such as pick work, jumper, blasting work , hard & soft rock saturated soil including chiselling/wedging out of rocks (where blasting work is prohibited)conglomerate rocks and mixed variety of soil etc.up to all leads and lifts stacking the serviceable and unserviceable material separately and disposal of excavated earth within all leads and lifts. excavation in earth work in all kinds and classification of soil such as pick work, jumper work, blasting work in soft or hard rocks and chiselling/wedging out of rocks (where blasting work is prohibited) lift up to all leads and lifts. wire crates made of interlink chain filled with boulders with square cut faces against the wire (wire crate to be measured and paid for separately) within all leads and lifts. wire crates made of interlink chain filled with boulders with square cut faces against the wire (boulders filling to be measured and paid for separately) interlink chain 4 mm thick
Sector: Medical and Health