Details: abstract cost providing & laying cc road carry traffic movement at hpmc oddi, district shimla (hp) s/h: paver top finish loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meeet requirment of tables 300.1 and 300.2 for subfrade construction as per technical specification clause 303.2 etc. as directed by the engineer-in-charege construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mount grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specification clause 401 for grading ii material providing and laying 60mm thick faciory made cement concrete interlocking paver block of m -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over over 100 mm thick cemen
Sector: Horticulture